Completed Projects
- Home
- /
- Completed Projects

High-Rise Apartments — 3 Towers, Srinagar Colony, Hyderabad
Among the first multi-storeyed / high-rise apartments in the heart of Hyderabad — 3 high-rise towers constructed in the same premises at Srinagar Colony. A 1,50,000 sft turnkey package showcasing RRV's high-rise structural capability.
War Memorial — Gymkhana Grounds, Secunderabad
Construction of the War Memorial obelisk at Gymkhana Grounds, Secunderabad — including the Ashoka Chakra cladded in granite, granite plinth, plaza and complete external façade lighting / external electrification.


14 Health Care Centres — 50-Bed Hospitals, Davanagere, Karnataka
Lump-sum tender turnkey project — construction of 14 Nos. Health Care Centres, each a 50-bed hospital located across various places in the Davanagere region of Karnataka. Total area 70,000 sft, including complete Internal & External Electrification works.
AP Secretariat — 2 Nos. H-Block, Hyderabad
Construction of 2 Nos. H-Block at the AP Secretariat, Hyderabad — a 1,00,000 sft turnkey package including complete Internal & External Electrification and central Air-Conditioning works.


JNTU Anantapur — Girls Hostel, Chemical Engg. Dept. & Guest House
Construction of the new Girls Hostel, Chemical Engineering Department and 1st floor of the Guest House at JNTU College, Anantapur District — a 2,00,000 sft turnkey package including complete Internal & External Electrification works.
Tadipathri Wind Power Evacuation — 10 Switchyards + 200 km of 33 kV Lines
Construction of 10 Nos. 0.433/33 kV switchyards and 200 km of 33 kV lines on lattice towers with DOG conductor across hilly terrain — evacuating 2.5 MW wind-power generation to the grid at Tadipathri, Anantapur District. Completed ahead of the scheduled 06 October 2005 milestone.


Karnataka Housing Board — 140 Residential Flats, Bangalore
Construction of 140 residential flats spread across 1,50,000 sft for the Karnataka Housing Board at Bangalore, including complete Internal & External Electrification — delivered on the scheduled completion date.
Orai to Bhoginipur — Embankment & GSB Works (NHAI)
Construction of embankments and Granular Sub-Base (GSB) works from Orai to Bhoginipur under the NHAI highway project — bulk earthwork, layered compaction and sub-grade preparation as per MORTH specifications.


MSEDCL Goathan Feeder Separation — Latur (System Improvement)
System improvement works at Latur under the Goathan Feeder Separation Scheme of MSEDCL — segregating agricultural and domestic loads through new distribution lines, transformer centres and feeder reorganisation to improve reliability and power quality.
NAC Display Building — Transformers & Switchgear
Supply and erection of 3 Nos. transformers — 2 × 500 kVA and 1 × 315 kVA — along with the associated HT & LT switchgear for the Display Building at the National Academy of Construction (NAC) Campus.


MSEDCL Infra Plan Phase-I — Osmanabad & Latur (Maharashtra)
Total erection on back-to-back basis along with supply of selected materials under the MSEDCL Infra Plan Phase-I across the Osmanabad and Latur circles — 33/11 kV substations, power transformers, transmission lines, HT/LT distribution and rural feeder strengthening across Maharashtra.

T&D – RE Works for BPL Domestic Services, Khammam (NPDCL)
Execution of Rural Electrification (RE) works and releasing of domestic service connections to Below-Poverty-Line (BPL) consumers in the Khammam Division of NPDCL on a semi-turnkey basis — including poles, conductors, distribution transformers and service drops.

RGUKT (IIIT) Nuziveedu — Buildings & MEP
Construction of buildings along with Internal & External Electrification works for the Rajiv Gandhi University of Knowledge Technologies (IIIT) campus at Nuziveedu, Krishna District, Andhra Pradesh.

RGUKT (IIIT) Idupulapaya — Buildings & MEP
Construction of buildings along with Internal & External Electrification works for the Rajiv Gandhi University of Knowledge Technologies (IIIT) campus at Rajiv Knowledge Valley (Idupulapaya), Kadapa District, Andhra Pradesh.

RIMS Srikakulam — MEP Works (500-Bed Hospital + College)
Internal & External Electrification along with HVAC / air-conditioning works for the Rajiv Gandhi Institute of Medical Sciences (RIMS) — a 500-bed hospital, college building complex and ancillary structures under Packages I & II at Srikakulam, Andhra Pradesh.

Palure 2×2.5 MW Hydro — Power House Construction
Construction of the Power House for a 2×2.5 MW small-hydro plant at Palure Village, Himachal Pradesh — including a 6.6 / 33 kV switchyard sub-station and an 8 km 33 kV evacuation line for grid connectivity.

Construction of 4 Road-Over-Bridges (ROBs) — Southern Railway, Chennai
Construction of 4 Nos. Road-Over-Bridges (ROBs) under Southern Railway, Chennai — specialised railway bridges executed under live-traffic conditions with railway safety protocols.

Hiring of HEMM — Open-cast Mining Works
Hiring of Heavy Earth-Moving Machinery (HEMM) including shovel, drill, dozer and allied equipment for transfer and transportation of materials across various strata. Scope included drilling, excavation, dumping, spreading, dozing and associated mining works.

IL&FS External Electrification — Hyderabad
Total erection on back-to-back basis along with supply of materials for external electrification of the IL&FS Township — package sub-stations, HT/LT panels, transformer yards and external power-distribution infrastructure.

IL&FS Internal Electrification — Hyderabad
Total erection on back-to-back basis along with supply of materials for internal electrification of IL&FS township and commercial blocks — including LT/HT panels, cable trays, distribution and complete electrification of residential towers and clubhouse.

Reliance Mini Eiffel Tower — Kadiyam, Pondicherry
Structural works for the iconic Reliance Mini Eiffel Tower — a 102-metre-high steel tower with a visitor facility platform at 47.0 m. Scope included internal & external electrification, grading and landscaping.

Daliganj Bridge Works — Lucknow, UP
Construction of civil works including manual and mechanical earthwork in all types of soils, back-filling of excavated earth within the premises and filling areas with earth brought from outside — including full consolidation, executed under the direction of the Engineer-in-Charge.

Aurobindo Tattava Township — Site Leveling Works
Site preparation and enabling works for the Aurobindo Tattava Township — earthwork to achieve the proposed formation level, site grading as per approved drawings with a controlled deviation tolerance, and filling of areas where required.